The following work was completed by Marcel Equipment:
Upon arrival to our yard, all covers were removed & unit was power washed
Visual & operational inspections were completed
Unit was serviced
Engine oil & filter changed, filter was cut open & checked for contaminates - clean
Transmission oil & filter changed, filter was checked - clean
Hydraulic filters changed & checked - clean
Checked oil levels in the final drives - good
Checked oil levels in the differentials – good
Inspected articulation hitch - see notes below
Inspected oscillation hitch- good
Engine, torque, transmission & hydraulic pressures were taken to ensure within OEM specs
The following repairs were completed ensuring a work ready unit:
NEW complete seat assembly & suspension group installed
NEW pin & bearing installed in center A-frame
NEW pin & bearing installed in rear A-frame
REBUILT articulation hitch with NEW bearings & pins
Installed NEW thermostats & seals
Replaced EGR cooler coupling
Resealed oil pan
Resealed front timing cover
Installed NEW front main crankshaft seal
NEW pin & bearings installed on right side box cylinder
NEW DPF filter was installed
Completed 5,000 hour service on emission system (spark plug, injector, filters)
Replaced any required hoses & lines including ones under cab
Inspected cab & completed all required repairs
Machine is ready to go to work
Price: $ 390000 CAD |
Price: $ 291000 USD |
CAT 730C2 (2017) UNIT# T4078 MACHINE HOURS: 7167 ECM IDLE HOURS: 2800 | |||
---|---|---|---|
![]() Repair / Condition Report The following work was completed by Marcel Equipment: Upon arrival to our yard, all covers were removed & unit was power washed Visual & operational inspections were completed Unit was serviced Engine oil & filter changed, filter was cut open & checked for contaminates - clean Transmission oil & filter changed, filter was checked - clean Hydraulic filters changed & checked - clean Checked oil levels in the final drives - good Checked oil levels in the differentials – good Inspected articulation hitch - see notes below Inspected oscillation hitch- good Engine, torque, transmission & hydraulic pressures were taken to ensure within OEM specs The following repairs were completed ensuring a work ready unit: NEW complete seat assembly & suspension group installed NEW pin & bearing installed in center A-frame NEW pin & bearing installed in rear A-frame REBUILT articulation hitch with NEW bearings & pins Installed NEW thermostats & seals Replaced EGR cooler coupling Resealed oil pan Resealed front timing cover Installed NEW front main crankshaft seal NEW pin & bearings installed on right side box cylinder NEW DPF filter was installed Completed 5,000 hour service on emission system (spark plug, injector, filters) Replaced any required hoses & lines including ones under cab Inspected cab & completed all required repairs Machine is ready to go to work | CAT 730C2