CAT 816F LANDFILL COMPACTOR (1996) - Unit #C2765
Machine Hours: 17840

CAT 816F Landfill Compactor




Price: Call for details
  • WARRANTY INCLUDED
  • Caterpillar 3306 DITA Engine
  • Engine Block Heater
  • Powershift Transmission
  • Cab (ROPS) with Air Conditioning
  • Enclosed Disc Brakes
  • CAT Chopper Wheels
  • CAT Landfill Blade
  • Single Front/Double Rear Striker Bars
  • Rear Radiator Guard
  • Lights, Heater, Mirrors
  • Inside Mirrors, AM/FM Radio
  • Ex-Municipal Unit
  • CAT Dealer Maintained Since 13906 Hours
  • All Records are Available
  • Rated at 235 HP.
  • Approximately 50,115 LBS.


Repair / Condition Report

The following repairs were completed by Marcel Equipment Limited at 13976 hours:

Due to excessive blowby on the engine, the following repairs were completed:

NEW CAT piston and liner kits were installed.

NEW CAT main and rod bearings were installed.

Installed a Toromont CAT reman cylinder head.

NEW front and rear main seals were installed.

All injectors were checked.

While the powertrain was removed the transmission, torque converter and transfer case were dismantled, checked over and then resealed.

Following are the repairs completed by Marcel Equipment Limited at 13898 hours:
NEW front differential pinion seal was installed.
NEW rear differential pinion seal was installed.
Removed rear differential assembly and resealed it.
While rear axle assembly was out we took the opportunity to roll in NEW Cat main, rod and thrust bearings and checked the engine oil pump.
REBUILT parking brake assembly.
Installed NEW suspension system on the cab seat.
Checked all the lights, wipers, and washers.
Installed NEW hydraulic hoses where needed.
Installed NEW slip yoke seal at articulation.
Checked fan hub bearings.
Checked radiator assembly.
Tightened hydraulic levers.
Checked transmission strainer.
Checked center articulation.
Checked rear axle oscillation.
Checked air conditioning system.
Installed NEW bearings on the lift cylinder mounts.
Installed NEW lift cylinder hydraulic hoses.
Checked drive line and the universal joints, etc.
Checked all grease fittings and grease lines.
Resealed left steering cylinder.
Installed a NEW air conditioning belt.

This unit will be going through Marcel Equipment Limited's reconditioning process again, further details will be posted once completed.